WIRELESS NETWORK UPGRADE AT THE ROBLIN CENTRE

I.T. Solutions will be performing wireless network upgrades at The Roblin Centre from Friday, August 25, 2017 to Friday, September 1, 2017.

These upgrades will result in intermittent loss of wireless network coverage in specific areas at The Roblin Centre as hardware is replaced.

If you have any questions or concerns please submit a Caselog at https://hub.rrc.ca/CaseLog/NewCase.aspx?Area=ITS&Category=58.